Day 1

Spray the old lawn

Weeks 2–4

Old lawn dies off

Install day

Cut, grade & lay sod

Weeks 1–2

Watering & care

1

Vegetation Control & Preparation

A healthy lawn starts with getting rid of what's there now, roots and all.

Weedy, patchy front lawn before Strada sod replacement Before
Old lawn fully dead after herbicide treatment, ready for removal 2–4 weeks after spraying
  • Application: We apply a commercial-grade non-selective herbicide to kill existing weeds and grass.
  • Timeline: This phase takes 2–4 weeks and usually includes more than one application.
  • Why it matters: Skipping this step risks old weeds growing back up through your new sod. No installer can promise a 100% weed-free future, but this prep greatly reduces the chance of old weeds coming back.

We strongly advise against rushing this phase. It's critical to how long your new lawn lasts. Replacing an old lawn? See our sod replacement & removal page.

2

Removal & Grading

Once the old lawn is dead, we prepare the soil bed.

Sod cutter removing the dead lawn in strips Sod cutting
Front yard raked and graded smooth, ready for new sod Finished grade
  • Excavation: Using a sod cutter or tiller, we remove the top layer of old turf and debris to a depth of about 2 inches.
  • Grading: We level the area carefully so water drains away from your home and the new sod sits flush with your driveway, walkways and beds.
3

Precision Installation

Sod installation is a craft that takes more than just laying grass.

Strada crew laying fresh sod pieces on the graded front yard Install day
Freshly installed sod lawn with tight seams the same day Right after install
  • Quality check: Every pallet is inspected when it's delivered. If the sod doesn't meet our standards, it doesn't go in the ground.
  • Staggered seams: We fit each piece like a puzzle, staggering the seams and making precise cuts around the curves of your property.
4

After Install: Care for New Sod

New sod is vulnerable for the first few weeks. With the right care and correct irrigation, it roots in fast. This is the same lawn one week later.

The same front lawn one week after Strada sod installation, green and rooting in One week later, with correct irrigation
  • Insecticide & fungicide: We recommend a professional application within 24–48 hours of installation to keep pests and fungus away from the new roots.
  • Irrigation: We set up your irrigation timer before we leave, so your new sod gets the right amount of water for the season.

Our Commitment

We refuse to cut corners by buying cheap turf from high-volume, low-quality farms. Our proven process keeps your lawn lush and healthy in every season.

Get Your Free Estimate

Owner on every job, from the first spray to the final walk-through.

Call Free Quote